Project

Wire Rod Mill and Meer Drive Installation

  • Mechanical and piping installation
Service
Mechanical Installation
Location
Italy
Year
2018
Shut-down period
December, 17th - December, 30th 2018
Technological supplier
SMS Group Spa

Ferretti Construction carried out the mechanical assembly and piping works for the installation of a wire rod mill and Meer Drive system at an industrial facility in Italy.

The intervention, conducted in cooperation with technological supplier SMS Group Spa, was completed over a highly compressed timeframe, from December 17th to December 30th, 2018. Efficient execution ensured compliance with the schedule and seamless integration with existing infrastructure.

Schedule:
December 17th – 30th, 2018

Gallery