Project
Roughing Mill Revamping
Service
Detail Design and Civil works on a Fast-Track Revamping basisLocation
Smederevo, SerbiaClient
HBIS - HESTEEL SERBIA IRON & STEEL D.O.O.Year
2017Shut-down period
12 Calendar daysTechnological supplier
Sms Group SpaFerretti Construction carried out the detailed civil design and civil works for the foundation revamping of the roughing mill at the HBIS – Hesteel Serbia Iron & Steel D.O.O. plant in Smederevo, applying its proprietary Fast-Track Revamping methodology.
The project, developed in collaboration with technology supplier SMS Group SpA, was completed within a very tight 12-day production shutdown window.
By using preassembled foundation blocks developed under a design & build approach, Ferretti significantly reduced on-site construction time while ensuring full integration with the existing plant layout and compliance with all critical deadlines.
Schedule:
Shut-down: 12 calendar days