Project

EAF Revamping

  • Fast-Track Revamping
Service
Civil Works on a Fast-Track Revamping basis
Location
France
Year
2019
Shut-down period
5 Calendar days (August 2019)

Ferretti Construction carried out the civil works for the revamping of an Electric Arc Furnace (EAF) in France, using a Fast-Track Revamping approach.

The intervention was completed within a tight 5-calendar-day production shutdown in August 2019, requiring highly accurate planning and operational efficiency to meet the compressed schedule and ensure full resumption of production activities.

Schedule:
5 calendar days – August 2019

Gallery