Project

EAF # 1 – Forced Draught Cooler Installation

  • Mechanical and piping installation
Service
Mechanical and Welding Works. Welding Type: FW (=Fillet-Weld); BW (=Butt-Weld)
Location
Italy
Year
2018

Ferretti Construction carried out mechanical assembly and piping works for the installation of a Forced Draught Cooler system connected to Electric Arc Furnace #1 at an industrial facility in Italy.

The project, completed in 2018, included FW (fillet-weld) and BW (butt-weld) welding types, performed to high quality standards to ensure system integrity under thermal and mechanical stress. Activities were coordinated with the plant’s ongoing operations.

Year of execution: 2018

Gallery