Project

Aluminium Wire Rod Drawing Installation

  • Mechanical and piping installation
Service
Mechanical Installation
Location
Italy
Year
June 2022 (no. 1 month)
Technological supplier
MFL Group Spa

Ferretti Construction carried out the mechanical installation of a new aluminum wire drawing line at a production site in Italy.

Working in the aluminum sector, as opposed to traditional steel environments, required an even more meticulous approach, with a strong focus on precision, cleanliness, and control over every installation detail, due to the material’s sensitivity and the complexity of the equipment.

The project was completed within a highly compressed timeframe, from June 9 to June 30, thanks to careful planning and efficient on-site management of all assembly activities.

Schedule:
Site presence: June 9th – June 30th