Project

110 TPH Reheating Walking Beam Furnace

  • Mechanical and piping installation
Service
Mechanical, piping, steel structures and electrical installation
Location
Duisburg, Germany
Year
2011 - 2012
Technological supplier
SMS MEER

Ferretti Construction carried out the electromechanical installation and piping works for a new 110 TPH walking beam reheating furnace at a steel plant in Germany.

The scope of work, performed between September 2011 and February 2012, included:

  • Assembly of 860 tons of mechanical equipment
  • Installation of 150 tons of piping and supports
  • Installation of 60 tons of electrical equipment
  • Insulation of combustion air piping covering 3,250 m²

The project was executed in collaboration with technological supplier SMS Meer, ensuring full integration with the plant systems and adherence to international quality and safety standards.

Timeline
On-site presence: September 2011 – February 2012