Project
110 TPH Reheating Walking Beam Furnace
Service
Mechanical, piping, steel structures and electrical installationLocation
Duisburg, GermanyYear
2011 - 2012Technological supplier
SMS MEERFerretti Construction carried out the electromechanical installation and piping works for a new 110 TPH walking beam reheating furnace at a steel plant in Germany.
The scope of work, performed between September 2011 and February 2012, included:
- Assembly of 860 tons of mechanical equipment
- Installation of 150 tons of piping and supports
- Installation of 60 tons of electrical equipment
- Insulation of combustion air piping covering 3,250 m²
The project was executed in collaboration with technological supplier SMS Meer, ensuring full integration with the plant systems and adherence to international quality and safety standards.
Timeline
On-site presence: September 2011 – February 2012